Popular New England Ski Mountain Power Outage

Case Study Details

Type of Job
Emergency
Customer Industry
Ski Resort
Equipment Needed

2000kW mobile diesel generator, 2500kVA mobile transformer, low and medium voltage cable

Generator Size

What Happened

A popular New England ski area experienced an unplanned power outage the night before what was scheduled to be one of their busiest weekends.  The time from the initial call to when power was restored via the emergency generator and transformer was approximately 6 hours.  The mountain was fully operational by the start of the next business day.

Services Provided

Prime Power Rentals provided full turnkey services which included the following:

  • Transportation of all equipment to & from the location
  • Manpower to set up, operate, & demobilize the project
  • Provided onsite fueling services