Type of Job
Planned
Customer Industry

What Happened

A Major NH electric utility had to replace aging equipment by replacing a double-circuit electric pole. To do so, electricity needed to be cut to a large steel mill for three days while the utility performed this project.

Services Provided

We provided 24/7 manpower for setup, monitoring, and demobilization, along with fueling logistics. This allowed the mill to maintain its round-the-clock manufacturing while the electric utility performed its work. Without our equipment, the mill would have faced three days of downtime, resulting in lost revenue and employee disruptions.

Table of Contents

Planned Backup Power

Trying to schedule a transformer replacement or performing system upgrades, but need to minimize outage duration? Whatever the application, Prime Power Rentals can provide the tools you need to help minimize customer downtime.

We offer generator rentals from 20kW – 2MW and transformers with accompanying medium voltage cables ranging from 1000kVA to 2500kVA in voltages from 4.16kV to 34.5kV. Let us help you in reaching your goal of minimizing CAIDI (Customer Average Interruption Duration Index).

Emergency Backup Power

Middle of the night downed pole due to a vehicle accident? Pad mount transformer failure serving an assisted living center? Emergency power interruptions happen every day due to a number of reasons ranging from inclement weather to an aging infrastructure. 

 We at Prime Power Rentals understand that the electric utilities top priorities are the safety of their employees, the safety of the public & restoring power to their customers. We offer generators ranging from 20kW – 2MW & utility grade primary voltage transformers that can be deployed 24/7/365. Our highly trained & safety driven staff are ready to respond no matter what the situation is. Let us help you in obtaining your goals.