New England Power Plant Planned Outage

Case Study Details

Type of Job
Planned
Customer Industry
Power Plant
Equipment Needed

2 1000kW diesel generators & all associated distribution cable

Generator Size

What Happened

New England power plant was performing annual maintenance on their equipment.

During this time, the facility needed to be disconnected from the power grid and their onsite power generation was inoperable due to required maintenance. Without back feed from the grid, the plant needed an alternative power source to keep plant essential equipment running.

Prime Power Rentals provided two 1MW diesel generators to tie into two separate onsite transformers for a one-week period while essential plant maintenance was performed.

Services Provided

Provided full turnkey services which included the following:

    1. Transportation of all equipment to & from the location
    2. Manpower to set up, operate, & demobilize the project
    3. Provided onsite fueling services